Dragon Runner 20 vs UGV 500 kg Tracked Platform
QinetiQ (Foster-Miller) vs Integra Robotics — specs, price, and data-backed comparison.

Dragon Runner 20
QinetiQ (Foster-Miller)
Not announced

UGV 500 kg Tracked Platform
Integra Robotics
Not announced
QUICK TAKE
- UGV 500 kg Tracked Platform offers the higher payload (500 kg vs 4.5 kg).
- UGV 500 kg Tracked Platform offers the faster top speed (7.92 km/h vs 6 km/h).
- Dragon Runner 20 offers the longer runtime (180 min vs 120 min).
- Dragon Runner 20 offers the lighter build (9 kg vs 200 kg).
SPECIFICATIONS COMPARED
| Dragon Runner 20 | UGV 500 kg Tracked Platform | |
|---|---|---|
| Company | QinetiQ (Foster-Miller) | Integra Robotics |
| Category | Military | Military |
| Price: | Not announced | Not announced |
| Weight | 9 kg | 200 kg |
| Payload | 4.5 kg | 500 kg |
| Speed | 6 km/h | 7.92 km/h |
| Battery Life | 180 min | 120 min |
| Connectivity | Radio, 650+ m line of sight; optional fibre-optic control tether | Encrypted 2.4 GHz wireless (UDP) and hybrid wired link (CAT-6, 1 Gbps); 300 m LOS / 80 m NLOS |
| Software / AI | Dragon Runner 20 wearable controller or UC-LITE controller | Android Unreal Engine operator app |
Buying guides and prices
FREQUENTLY ASKED QUESTIONS
What is the difference between the Dragon Runner 20 and the UGV 500 kg Tracked Platform?
Dragon Runner 20 is made by QinetiQ (Foster-Miller), while UGV 500 kg Tracked Platform is made by Integra Robotics. Both are militarys, so the differences come down to price and specifications.
Which has the higher payload, the Dragon Runner 20 or the UGV 500 kg Tracked Platform?
The UGV 500 kg Tracked Platform has the higher payload at 500 kg, compared to 4.5 kg for the Dragon Runner 20.
Which is faster, the Dragon Runner 20 or the UGV 500 kg Tracked Platform?
The UGV 500 kg Tracked Platform has the higher top speed at 7.92 km/h, compared to 6 km/h for the Dragon Runner 20.
Which has the longer battery life, the Dragon Runner 20 or the UGV 500 kg Tracked Platform?
The Dragon Runner 20 has the higher runtime at about 180 minutes, compared to about 120 minutes for the UGV 500 kg Tracked Platform.
