Implantações de robôs: ainda em operação?

Implantações nomeadas a partir de fontes públicas: quem operou os robôs, quais robôs e o que aconteceu. Pausas e remoções permanecem no registro ao lado dos sucessos.

24.4% das implantações nomeadas registradas terminaram ou nunca passaram de um piloto.

112 implantações· Entre gratuitamente para ver todos os números, as ressalvas e as fontes.

Aeroportos

Narita International Airport — terminal floors

Narita · 2 Avidbots Neo + 10 Cyberdyne CL02 · from 25 Nov 2019

T2
12robots: 2 hard-floor scrubbers, 10 carpet
~920,000 m²terminal floor area to keep clean

Robôs:Cleaning Robot CL02 (Cyberdyne Inc.)

Changi Airport — Terminal 4

Singapore · 4 cleaning robots at opening (+6 planned) · floors, car parks, toilets

T2
~20%less housekeeping manpower (airport’s projection)
SGD 80kper robot

Agricultura

Metrolina Greenhouses — HV-100 plant-spacing robots (Huntersville, NC)

USA (North Carolina) · Harvest Automation HV-100 · bought 2013

T3
<1 yearpayback: the robots paid for themselves in under a year
0workers' compensation claims after the robots arrived

Robôs:HV-100 Plant Handling Robot (Harvest Automation)

University of Arkansas — See & Spray soybean trial

Keiser, Arkansas · John Deere See & Spray (prototype) · 3 seasons, 2022–2024

T2
43–59%less herbicide than broadcast spraying
+280%a year in weed seed bank at the LOW sensitivity setting

Robôs:See & Spray (Blue River Technology)

Iowa State University — 415-acre spraying demonstration

Boone & Story counties, Iowa · See & Spray Ultimate · 5 soybean fields, 2024

T2
76%average herbicide product saved
43.9–90.6%saving by field — set by weed pressure

Robôs:See & Spray Ultimate (Blue River Technology)

Estudo

Large US dairies on robotic milking — 27-farm survey

USA · Lely & DeLaval, ≥7 milking boxes · 405–17,000 cows per herd

T2
22%of farms cut full-time staff by 30–50%
>21%labour-cost cut, reported by 35% of farms
Estudo

Abundant Robotics — apple harvester shut down

California / Washington orchards · vacuum apple picker · SRI spin-out 2016, closed mid-2021

T2
$12Mraised, then no further round
50–90%of apples reachable (company claim)

Robôs:Abundant Robotics Apple Harvester (Abundant Robotics)

Armazéns e logística

Ainda em operaçãoOperador: Kroger

Kroger — Ocado fulfilment centres

USA · 8 CFCs opened → 3 closed Jan 2026

T2
3 of 8CFCs closed
$2.6bnimpairment
Ainda em operaçãoOperador: DHL Supply Chain

DHL Supply Chain — Stretch container unloading

North America, UK & Europe · Boston Dynamics Stretch · 10 robots in 3 countries (Jun 2025)

T2
10Stretch robots unloading containers, across 3 countries (Jun 2025)
×2fleet DHL planned by end-2025

Robôs:Stretch (Boston Dynamics)

Ainda em operaçãoOperador: DHL Supply Chain

DHL Supply Chain — Unilever warehouse, Bornem (Belgium)

Belgium · autonomous Rocla reach trucks (Logisnext) · 1,000 pallets a day, 24/7

T2
1,000pallets moved per day by the autonomous forklifts at Bornem, running 24/7
10–15pallets per hour per unit, about 65% of human productivity (DHL fleet-wide, 2021)
Ainda em operaçãoOperador: GNC

GNC — Whitestown, Indiana reserve warehouse inventory drones

USA · 4 drones · 250,000 sq ft reserve inventory

T3
Monthlyfull reserve audit, up from quarterly
~98/daydaily nonshipments, down from several hundred

Performance Food Group — autonomous floor scrubbing in distribution centers

USA · Tennant T16AMR · PFG distribution centers

T3
2-4 h/dayoperator time the manual scrubber needed before autonomy
110+ hautonomous runtime logged by the T16AMR
Ainda em operaçãoOperador: GXO Logistics

GXO Logistics — Digit humanoids at the Spanx warehouse, Flowery Branch (Georgia)

USA · Agility Robotics Digit · totes from mobile robots onto conveyors · robots-as-a-service since 2024

T2
100,000+totes moved at Flowery Branch since the test began, per GXO
2more GXO sites (Statesville, Lebanon) due to get Digit, from early 2027

Robôs:Digit (Agility Robotics)

Ainda em operaçãoOperador: DHL Supply Chain

DHL Supply Chain — Locus Robotics

Global · 500 million picks · LocusBot / Origin

T2
10M picksfirst 2.5 years
100M pickslast 154 days

Robôs:Locus Origin (Locus Robotics)

Ainda em operaçãoOperador: Amazon

Amazon fulfilment network

USA · 150+ sites · Kiva-derived drive units

T2
~100 → ~400items/hour, manual → robotic
750,000+robots deployed

Robôs:Kiva Drive Unit (Amazon Robotics)

Ainda em operaçãoOperador: Woolworths Group

Woolworths Group — Primary Connect

Australia · Moorebank & WSY DCs · KNAPP + Vanderlande

T2
1,350 → 650workforce across replaced sites
ASX-disclosedredundancy programme
Ainda em operaçãoOperador: Ocado Group

Ocado — Andover and Erith fires

UK · 2019 and 2021 · grid bots

T2
30,000 orders/wkAndover capacity lost, 2019
7 weeksErith revenue decline post-fire, 2021
Ainda em operaçãoOperador: Coles Group

Coles Group — WITRON case automation

Australia · Redbank & Kemps Creek

T2
+20%store availability, Redbank vs manual
A$120moverrun on separate Ocado CFCs
Ainda em operaçãoOperador: JD Logistics

JD.com — "Asia No.1" warehouse, Shanghai

China · JD automated sorting · 100,000 m² first phase, Oct 2014

T2
16,000packages an hour sorting capacity
99.99%sorting accuracy
InterrompidoOperador: Amazon

Amazon — Scout sidewalk delivery field tests (ended)

USA · Amazon Scout sidewalk robot · launched 2019, tests ended Oct 2022

T2
2019year Amazon launched Scout
Oct 2022field tests ended; parts of the programme 'weren't meeting customers' needs'
Estudo

Georgia-Pacific — Chicagoland distribution center, Outrider yard automation

USA · autonomous trailer moves · 1,000+ moves (Nov 2021)

T3
1,000+autonomous trailer moves in daily operations at the Chicagoland distribution center

Construção

Ainda em operaçãoOperador: EnviroVantage

EnviroVantage — University of New Hampshire stadium

Durham, NH · Brokk 100 + concrete crusher · 3-level reinforced announcer’s box, 2016

T2
72man-days for the whole demolition
105.8 yd³concrete and rebar removed

Robôs:Brokk 100 (Brokk)

Ainda em operaçãoOperador: DPR Construction

DPR Construction — Dusty Robotics layout printing

USA · Dusty Robotics layout robot with operator · pilot projects

T2
5×faster at layout than a typical two-person crew (pilot projects)
Ainda em operaçãoOperador: Diamond Drilling

Diamond Drilling — Romania

Romania (projects in the Gulf, Asia, Australia) · Brokk 170 + Brokk 110 · bought 2018

T3
≥ 2×faster wall tear-down than diamond tools alone
~2×turnover within a year

Robôs:Brokk 110 (Brokk) , Brokk 170 (Brokk)

Educação

Estonia — ProgeTiger national programme

Estonia · programming and robotics in schools and kindergartens · since 2012

T2
2012national programme launched
> 50%of schools teach programming and robotics (2022)
Estudo

Basra primary schools — randomised trial with Ozobots

Basra, Iraq · Ozobot coding robots · 20 schools, Grade 4, two-day classes

T2
960pupils in the robotics arms
girls onlysignificant gain in computational thinking

Robôs:Ozobot (Ozobot)

Estudo

Robots in STEM classes — meta-analysis of 21 studies

K-16 · educational robotics vs no robots · studies 2010–2022

T2
g = 0.49overall effect on STEM learning (moderate)
g = 0.95in technology classes

Hotéis

Ainda em operaçãoOperador: M Social Singapore

M Social Singapore — Millennium

Robertson Quay · 293 rooms · Relay "AURA" + egg robot

T2
5 → 3 mindelivery, human vs robot
2:30 → ~1:00egg dish prep time

Robôs:Relay (Savioke)

Ainda em operaçãoOperador: Residence Inn LAX

Residence Inn LAX — Marriott

Los Angeles · Relay "Wally"

T2
1robot
short-circuitedwet towels in compartment

Robôs:Relay (Savioke)

Ainda em operaçãoOperador: Hotel EMC2

Hotel EMC2 — Autograph Collection

Chicago · 2× Relay "Leo & Cleo" · 195 rooms

T2
2robots for 195 rooms
~2×in-room dining sales (no baseline, T3)

Robôs:Relay (Savioke)

Park Avenue Rochester

Singapore · 311 rooms · 2× Techmetics "Techi" · STB-funded

T3
6 → 3room-attendant vacancy gap
S$100kper unit

Robôs:Techi Linen Cart (Techmetics)

Nagoya Prince Hotel Sky Tower — Sky Dining

Nagoya · buffet restaurant, 31F · Delivery X1 clearing robot

T3
~100round trips a day
3.3 hof carrying per day taken over

Robôs:Delivery X1 (Gausium)

Kobe Meriken Park Oriental Hotel

Kobe · buffet (3F) + steakhouse (14F) · 2 Keenbot T5

T3
~100floor-to-dish-room trips a day (3F, peak)
~5 minper round trip from the 14F restaurant

Robôs:DINERBOT T5 (Keenon Robotics)

Sapporo View Hotel Odori Koen — breakfast

Sapporo · 300–400 breakfast guests a day · 2 Servi Plus

T3
½staff walking distance (restaurant manager)
300–400breakfast guests a day

Robôs:Servi Plus (Bear Robotics)

Henn na Hotel — H.I.S.

Nagasaki & Tokyo · 243 robots at peak · cut in 2019

T2
30 → 7staff per hotel
~⅓labour cost vs peers
Estudo

Garden City Hotel

Long Island, NY · 2× SoftBank Whiz · ~US$30k each

T2
40 minper floor
1 person/dayredeployed

Robôs:Whiz (SoftBank Robotics (formerly Aldebaran Robotics))

Estudo

Crowne Plaza Silicon Valley

Milpitas, CA · Relay "Dash" · ~2 years live

T2
10–15 → 3 minper delivery
20–25requests per day

Robôs:Relay (Savioke)

Estudo

88 Chinese hotels — in-room robots

23 cities · 789 rooms · Cornell CHR study

T2
745,000guest commands in one year
2 months → 2 yearspayback range across hotels
Estudo

NEW MARUYA Hotel — Katayamazu Onsen

Ishikawa · Yukai Resort buffet, ~400 guests a day at peak · 1 Keenbot T5

T3
~78%of food runs done by the robot
30–40k → under halfstaff steps a day at New Year peak

Robôs:DINERBOT T5 (Keenon Robotics)

Indústria

Trelleborg Sealing Solutions — Helsingør

Denmark · 42 Universal Robots UR5/UR10 · CNC tending

T2
3 → 8CNC machines per operator
50people hired

Robôs:UR5 (Universal Robots) , UR10 (Universal Robots)

Ainda em operaçãoOperador: Freedman Seating

Freedman Seating — Chicago

Chicago · 3 Vectis welding cobots · bus & RV seat frames

T2
12 → 3½ minweld time per stainless seat
~200%more output on that part (journalist’s estimate)

Robôs:UR10e (Universal Robots)

Ainda em operaçãoOperador: Schaeffler

Schaeffler — Digit carrying parts baskets, South Carolina plant

USA · Agility Robotics Digit · baskets from a stamping press to a conveyor · behind a barrier

T3
25 lbbaskets carried from a stamping press to a conveyor, about one minute a trip
2 × 4 hshifts a day, with a recharge break between them

Robôs:Digit (Agility Robotics)

Toyota Motor Manufacturing Canada — Digit humanoids, Woodstock plant (Ontario)

Canada · Agility Robotics Digit · 7 leased robots after a 3-robot pilot · parts totes at an automated tugger

T2
7Digit robots in the commercial deployment at Woodstock
3robots in the year-long pilot that came first

Robôs:Digit (Agility Robotics)

Ainda em operaçãoOperador: CATL

CATL — Xiaomo humanoids on the battery-pack line, Zhongzhou base (Luoyang)

China · Spirit AI Xiaomo · plugging in high-voltage battery connectors · from December 2025

T2
99%success rate at the connector plug-in task, per CATL
3×a human worker's daily workload, because the robots take no breaks
Ainda em operaçãoOperador: Gwangjin Group

Gwangjin Group — Asan plant

Korea · Doosan M-series cobots · riveting, inspection, sorting

T2
12 → 1–2defects per six-line batch
₩1.3bninvested

Robôs:M1013 (Doosan Robotics)

CM Welding & Machine — Midland, Texas

Midland, TX · 2 welding cobots (third planned) · oil & gas modules, high-mix

T2
≥20%faster setup than its traditional robot cell
2 → 3cobots (third planned for 2024)
Ainda em operaçãoOperador: Red Devil

Red Devil — Pryor, Oklahoma

Pryor, OK · 1 Yaskawa Motoman MPL80 II · caulk & sealant lines

T2
50% → 90%+of the time at the 100 tubes/min target
~2×production capacity, same filling equipment

Robôs:MPL80 II (YASKAWA Electric)

Ainda em operaçãoOperador: Cosmo Japan

Cosmo Japan — skewer line

Hokkaido · Denso SCARA with vision · METI case

T2
3 → 1workers on the process
8,400 → 7,000output per day

Robôs:HSR Series (DENSO Robotics)

Ainda em operaçãoOperador: Sargento Foods

Sargento Foods — Plymouth, Wisconsin

Plymouth, WI · 8 FANUC M-410iB cells · centralised cheese palletizing

T2
8 × 3robot cells × palletizing lanes
700 ftlongest trunk conveyor feeding the cells

Robôs:M-410iB (FANUC)

Ainda em operaçãoOperador: Recochem

Recochem — Edmonton

Edmonton, Alberta · 1 Motoman EPL80 · case pack + palletize, 9.46 L bottles

T2
+35%throughput vs packing by hand
3 → 1operators on the line

Robôs:EPL80 (YASKAWA Electric)

Ainda em operaçãoOperador: Urano

Urano — lights-out machine tending

Nagasaki · FANUC M-10iA · METI case

T2
3 × 7 h → 1 × 2 hpeople × hours on the process
lights-outmachining cell

Robôs:FANUC M-10iA (FANUC)

Ainda em operaçãoOperador: Natures Way Foods

Natures Way Foods — Selsey

Selsey, UK · 2 PWR delta robots · coleslaw pots into cases and crates

T3
140pots per minute
< 15 minformat changeover

Robôs:PWR delta robot (PWR Pack)

InterrompidoOperador: Boeing

Boeing 777X — FAUB abandoned

Everett · robotic fuselage assembly · 4 years

T2
4 yearsof trial
abandonedfor flex-track + mechanics
InterrompidoOperador: Tesla

Tesla Fremont — Model 3, 2018

California · bespoke automated conveyor and assembly

T2
5,000/wktarget
<2,500/wkachieved at the time
Somente pilotoOperador: BMW Group

BMW Group — Figure 02 body-shop pilot, Plant Spartanburg (South Carolina)

USA · Figure AI Figure 02 · positioning sheet-metal parts for welding · ten-month pilot in 2025

T2
30,000+BMW X3 built with the robot's support over ten months
90,000+components moved

Robôs:Figure 02 (Figure AI)

Somente pilotoOperador: Siemens

Siemens — Humanoid HMND 01 proof of concept, Electronics Factory Erlangen

Germany · Humanoid HMND 01 wheeled Alpha · totes from a stack to a conveyor · two weeks on site

T3
60/htote moves an hour, the target set for the test
8 h+uptime

Robôs:HMND 01 Alpha Wheeled (Humanoid)

Limpeza e facilities

Mitsui Fudosan Facilities

Tokyo · 12× Panasonic RULO Pro · two office towers · 12 months

T2
20 → 8 minhuman time per corridor floor
5 g → 11 gdust collected per floor

Robôs:RULO Pro (Panasonic)

Single Stream Recyclers — Sarasota MRF (Florida)

USA · AMP Cortex sorting robots · 14 robots across several lines (2019)

T3
14AMP Cortex robots on SSR's sorting lines after the 2019 expansion
70–80items picked a minute per robot, per SSR's co-owner
Ainda em operaçãoOperador: SMRT Trains

SMRT Trains — Circle Line

Singapore · 89 robots (Avidbots, LionsBot, Gausium) · stations

T2
30 → 10 minper station area
89robots in the fleet

Odakyu Building Service

Tokyo · 4× Amano RcDC · university building, 3,464 m² corridors

T2
53.6%of area robotisable
520 → 253 mintheoretical → measured

Robôs:RcDC (Amano)

Ainda em operaçãoOperador: Biken Techno

Biken Techno

Tokyo · Amano RcDC · 21-storey office

T2
45–60 → ~30–45 mindust removal per floor
28–52 g/hdust removal rate

Robôs:RcDC (Amano)

Ainda em operaçãoOperador: JR Kyushu

JR Kyushu — Nagasaki & Hakata stations

Japan · SoftBank Scrubber 50 Pro · 4,400 m² · nights

T2
2–3 → 1night staff per concourse (T3)
01:00–04:00unattended run

Robôs:SCRUBBER 50 (Gausium)

Singapore General Hospital — autonomous floor scrubber trial

Singapore · autonomous scrubber robots · inpatient wards · 2021 trial

T2
-57%floor mopping time (35 to 15 minutes)
Estudo

Tokyo BMA benchmark hall

Tokyo · Amano and Figla timed vs a human cleaner, Makita demonstrated · 2017

T2
1.5×slower than human on vinyl
2×slower on carpet

Robôs:F.ROBO CLEAN (Figla) , Robot Cleaner RC200DZ (Makita) , RcDC (Amano)

Residências

Estudo

Georgia Tech — 30 households, six months with a Roomba

Atlanta · iRobot Roomba · 30 first-time households, 149 home visits

T2
30households, followed for six months
13named the robot within two weeks
Estudo

Stiftung Warentest — robot mower test

Germany · 14 robot mowers rated, 8 without boundary wire · Mar 2026

T2
14mowers rated, Good to Deficient
€300–1,700price range tested
Estudo

Robot mowers vs hedgehogs — 18-model safety test

Denmark / Oxford · 18 robot mower models · peer-reviewed, 2021

T2
18mower models tested
0detected a juvenile hedgehog (< 200 g)
Estudo

Maytronics (Dolphin) — private pool robots, 2024

Global · Dolphin robot pool cleaners · market leader’s annual report

T3
30–31Mprivate pools suited to robot cleaning (company estimate)
71.5%of the company’s 2024 sales from private-pool robots

Restaurantes e alimentos e bebidas

Ainda em operaçãoOperador: Skylark Holdings

Skylark Group — Gusto, Syabu-Yo, Bamiyan

Japan · 3,000 Pudu BellaBot · 2,149 stores

T2
−42%floor staff steps per shift
−35%clear-down time

Robôs:BellaBot (Pudu Robotics)

Ainda em operaçãoOperador: Sweetgreen

Sweetgreen — Infinite Kitchen restaurants

USA · Spyce Infinite Kitchen automated bowl line · 2 pilots (2024) → 20+ restaurants (Dec 2025)

T2
28%Q1 2024 restaurant-level margin at the 2 suburban Infinite Kitchens, 10 pts above fleet
$2.6Myear-one average unit volume those 2 stores were tracking
Ainda em operaçãoOperador: Kura Sushi USA

Kura Sushi USA

37 restaurants · Pudu delivery robots · NASDAQ-listed

T2
5–7 → 8–10tables per server
50–60 bpslabour, three initiatives combined
Ainda em operaçãoOperador: Noodle Topia

Noodle Topia

Madison Heights, Michigan · 3× BellaBot · owner Li Zhai

T2
5–6 → 3floor staff at same volume
~$15kper robot, one-off

Robôs:BellaBot (Pudu Robotics)

Ainda em operaçãoOperador: Watami

Watami — Yakiniku no Watami

Japan · SoftBank Servi + JSP Peanuts · TSE-listed

T2
10–12 → 4hall staff per shift, ¥1M/day store
6:37 → 4:49table clearance (vendor-measured)

Robôs:Servi (Bear Robotics)

Ainda em operaçãoOperador: Haidilao

Haidilao

China · 958 robot waiters (2020 filing) · HKEX-listed

T2
958robot waiters, Aug 2020
RMB 2–3kper robot per month (press)

Cafe X — downtown San Francisco robotic coffee bars (closed)

USA · Cafe X robotic coffee bar · 3 downtown SF sites, 2017 – Jan 2020

T2
3downtown San Francisco locations shut in January 2020
Up to 6drinks a minute claimed for the newer V2.1 airport machine

Robôs:Cafe X Robotic Coffee Bar (Cafe X Technologies)

Chili's Grill & Bar — "Rita"

USA · Bear Robotics Servi · 10 → 61 locations → paused

T2
61locations at peak
77%guests: server spent more time

Robôs:Servi (Bear Robotics)

Somente pilotoOperador: Saizeriya

Saizeriya

Japan · Servi pilot · former president on record against

T2
½walking distance at pilot store (T3)
+4%peak turnover 'on some occasions' (T3)

Robôs:Servi (Bear Robotics)

Estudo

Norwegian family restaurants

Norway · four-tray robot, brand withheld

T2
10 → 2waiter trips, 20-cover table
320 mwalking saved per large table

Saúde

UCSF Medical Center — Mission Bay

San Francisco · 27 Aethon TUGs · US$6M programme

T2
157,000trips per year
~30fewer hires

Robôs:TUG (Aethon)

University Hospitals Coventry and Warwickshire NHS Trust — da Vinci programme

UK · da Vinci Si (2013), Xi and X · 1,500+ operations on the Si

T2
60%reduction in patients' length of stay, per the trust (no baseline given)
1,500+operations on the trust's da Vinci Si since 2013

Robôs:Da Vinci Xi (Dr. Da Vinci Xi) (Intuitive Surgical)

Franciscan Health Crown Point — TUG cart deliveries to the wards

USA (Indiana) · 6 Aethon TUG T3 · kitchen and linen carts to hospital floors by elevator

T2
6Aethon TUG T3 robots carrying linen, towel and meal-tray carts from the kitchen and EVS to the floors
0jobs eliminated, per the hospital

Robôs:T3 (Aethon)

Self Regional Healthcare — central lab specimen robot 'Rosie' (Greenwood, SC)

USA (South Carolina) · Swisslog RoboCourier · lab specimen delivery to five testing areas

T3
50 mincollection to reporting, achieved 90% of the time (target before the robot: 75% within 75 minutes)
Ainda em operação

Froedtert Hospital (Milwaukee) — Aethon T3 linen and waste carts

USA · 5 Aethon T3 robots · 78,000+ deliveries in 2024

T2
78,000+deliveries by the five TUG robots in 2024
9,700+ midistance travelled by the robots in 2024

Robôs:T3 (Aethon)

Tan Tock Seng Hospital — OPAS

Singapore · outpatient pharmacy automation · 1,400 patients/day

T2
30% → 5%rework rate
0dispensing errors

Robôs:Parata Max (Parata Systems) , BD Rowa Vmax (BD Rowa)

Yamagata University Hospital — ICU

Japan · Xenex pulsed-xenon UV

T2
13.8 → 9.9MRSA per 10,000 patient-days
48.5 → 18.1MDR-Acinetobacter

Robôs:Xenex LightStrike (Xenex Disinfection Services)

Ainda em operaçãoOperador: El Camino Hospital

El Camino Hospital

Silicon Valley · 19 Aethon TUGs

T2
$350k/yrrobot programme
$1M/yrequivalent labour

Robôs:TUG (Aethon)

MultiCare Health System — Moxi removed

Tacoma & Puyallup · 14 Diligent Moxi (2023) → 0 (2025)

T2
14 → 0robots
"not financially sustainable"system spokesperson

Robôs:Diligent Moxi (Diligent Robotics)

Estudo

Rwanda national blood service — Zipline drone delivery

Rwanda · Zipline fixed-wing delivery drones · 12,000+ deliveries over four years (from 2016)

T2
-79 minaverage time for blood to arrive for transfusion, vs ambulance
-2/3wasted blood units
Estudo

New York State Office for the Aging — ElliQ in older adults' homes

New York State · Intuition Robotics ElliQ · 800+ older adults in the first year (2022–23)

T2
800+older New Yorkers given ElliQ in the first year
95%reduction in loneliness, per programme data reports

Robôs:ElliQ (Intuition Robotics)

Estudo

LAMP trial — Xenex null result

Detroit · 2 hospitals, 379 beds · cluster-randomised, sham-controlled

T2
3.49 vs 3.17HAIs per 1,000 patient-days, UV vs sham
RR 1.10P = .23

Robôs:Xenex LightStrike (Xenex Disinfection Services)

Segurança e patrulha

State Grid Suqian Power Supply — 500 kV digital inspection demonstration substation

China (Jiangsu) · inspection robots, robot dogs, drone dock, ~170 cameras · in service Dec 2025

T2
~47%less inspection workload
3–4fewer people needed per substation inspection

Huntington Park PD

California · K5 · six annual renewals

T2
$6,000 → $8,000budgeted vs actual per month
not wiredemergency button to dispatch

Robôs:K5 (Knightscope)

Ainda em operaçãoOperador: Sellafield Ltd

Sellafield — Spot in active nuclear areas

Cumbria, UK · Boston Dynamics Spot · cell inspection & clean-up, 2023

T2
½the predicted cost of the work
2 + 7 → remoteoperators plus support staff per entry, replaced

Robôs:Spot (Boston Dynamics)

World Trade Center — first rescue-robot deployment

New York, Sept 2001 · CRASAR tracked robots on 30 m tethers · rubble search

T2
up to 17CRASAR robots on site within hours
0living victims found

Robôs:TALON (QinetiQ (Foster-Miller)) , PackBot (Teledyne FLIR)

Ainda em operaçãoOperador: US Army

US Army — counter-IED robot fleet

Iraq & Afghanistan · PackBot, TALON and others · 2007 → consolidation

T2
7,000unique robots bought in a decade
3core platforms the Army is consolidating onto

Robôs:PackBot (Teledyne FLIR)

San Francisco SPCA

Mission District · K5 · ordered removed

T2
$6–7/hrrobot
$16/hrguard

Robôs:K5 (Knightscope)

San Antonio International Airport

Texas · K5 · $21,000/yr approved, never taken up

T2
7–3council vote to approve
1 monthtest

Robôs:K5 (Knightscope)

Estudo

NYPD — Times Square subway K5

New York · $9/hr lease · ended Feb 2024

T2
$9/hrlease
2 officersescorting it throughout

Robôs:K5 (Knightscope)

Estudo

City of Hayward — Watkins St garage

California · Knightscope K5 · 2 years

T2
9 → 3thefts, pre vs with robot
$137,000+over two years

Robôs:K5 (Knightscope)

Estudo

City of Dublin, Ohio — "DubBot"

Ohio · 2× K5 · ended May 2026

T2
$128,080year one
0incidents identified

Robôs:K5 (Knightscope)

Varejo

Ainda em operaçãoOperador: Walmart

Walmart — Auto-C autonomous floor scrubbers

USA · BrainOS-powered scrubbers · ~360 stores (Dec 2018) → 1,500 more units (Apr 2019)

T2
1,500new autonomous floor cleaners ('Auto-C') announced Apr 2019
up to 360stores in the Dec 2018 expansion with Brain Corp
Ainda em operaçãoOperador: Schnucks

Schnucks — Simbe Tally

St. Louis · 111 stores · shelf-scanning

T2
111stores
≥20%out-of-stock reduction (joint figure, T3)

Robôs:Tally (Simbe)

Ainda em operaçãoOperador: Stop & Shop

Stop & Shop / Giant — "Marty"

US Northeast · ~500 units · $35,000 each

T2
$35kper robot
~40hazards per store per day (self-reported)

Robôs:Digital Teammate (Badger Technologies)

Ainda em operaçãoOperador: Co-op

Co-op — Starship robot delivery, Milton Keynes

UK · Starship sidewalk robots · 8 Co-op stores, from 2018; Northampton 2020

T2
3×Co-op robot deliveries in Milton Keynes during Covid
up to 300robots planned across the UK by end-2021

Robôs:Starship Delivery Robot (Starship Technologies)

InterrompidoOperador: Walmart

Walmart — Bossa Nova cancelled

USA · ~500 stores · shelf-scanning · ended Nov 2020

T2
350 → ~500 → 0stores with robots
cancelledafter 5 years of trials

Robôs:Bossa Nova shelf-scanning robot (Bossa Nova Robotics)

InterrompidoOperador: Amazon

Amazon — Just Walk Out retreat

USA · Fresh stores removed · Go stores 31 → 22

T2
700 of 1,000transactions human-reviewed, 2022 (T3, disputed)
31 → 22Amazon Go stores

Stanford Shopping Center — robots docked

Palo Alto · Knightscope K5 · patrolling from 2015, suspended Jul 2016

T2
Jul 2016all robot patrols suspended after a child was hurt
16 monthsage of the child — bruised foot, scraped leg

Robôs:K5 (Knightscope)

Albert Czech Republic — AI shelf-scanning robots pilot

Czechia · Brain Corp BrainOS scanning · pilot, size not disclosed

T3
High 90s %accuracy identifying products, price tags and exceptions, against a 90% target

Canadian Tire — Sanctuary AI robot pilot at a Mark's store, Langley (British Columbia)

Canada · Sanctuary AI general-purpose robot, operated by a person · one-week pilot, January 2023

T2
110retail tasks completed in the pilot
1 weeklength of the pilot
Somente pilotoOperador: Margiotta

Margiotta — Pepper "Fabio"

Edinburgh · one store · one week

T2
12 vs 2customers drawn per 15 min, human vs robot
1 weekthen removed

Robôs:Pepper (Aldebaran Robotics (SoftBank / United Robotics))

Somente pilotoOperador: Lowe's

Lowe’s — Philadelphia car parks

Philadelphia · Knightscope K5 · 4 stores, pilot from Feb 2023

T2
4Philadelphia stores (more in 4 states + DC)
$6–9/hrannual robot contract, Knightscope’s figure

Robôs:K5 (Knightscope)

Estudo

FamilyMart + Telexistence — Manila operations

Japan / Philippines · 300 stores · remote-rescued arms

T2
4%robot failure rate
1 : 50operators to robots

Robôs:TX SCARA (Telexistence)

Como contamos

Cada cartão resume uma implantação com base em fontes públicas: declarações do próprio operador, documentos oficiais, imprensa com porta-vozes identificados ou estudos independentes. T2 = relatado pelo operador ou observado de forma independente; T3 = declarado pelo fornecedor. Interrompido significa que o operador encerrou ou removeu publicamente os robôs; somente piloto significa um piloto que não teve continuidade; um estudo é um piloto ou levantamento sem um único operador. A ausência de uma empresa aqui significa que ainda não temos registro dela, não que ela não tenha implantações.

24 casos de uso estão classificados como Comprovados, cada um respaldado por pelo menos uma implantação aqui. Ver casos de uso →

Em 2026-11-24 · Citação gratuita, com link para esta página.