描述
Ranger is a medium unmanned surface vessel operated by the US Navy and delivered by Leidos - the first of the Ghost Fleet Overlord vessels, designated OUSV 1. It is not a clean-sheet design. Ranger started as a commercial fast supply vessel of the kind built to run crew and cargo out to offshore oil and gas platforms, with the hull built by Gulf Craft of Franklin, Louisiana. Gibbs & Cox, a Leidos subsidiary, converted it to operate autonomously under the Strategic Capabilities Office's Ghost Fleet Overlord programme. Using a proven commercial hull was the point: it made a large, high-endurance autonomous ship cheap enough to experiment with. The vessel is 193 feet (59 m) long with a 32 foot (10 m) beam, carries up to six containers on deck as modular payload, and is driven by waterjets on five 2,000 hp (1,491 kW) diesel main engines with three generators. It runs LAVA, the Leidos Autonomous Vessel Architecture, and is semi-autonomous rather than fully independent - operators stay in the loop or on the loop. In 2021 Ranger test-fired an SM-6 Standard Missile from a modular launch system on its deck, demonstrating that an uncrewed hull could carry and employ a strike payload. It transferred to the Navy in early 2022, and in 2023 it crossed the Pacific with Seahawk, Sea Hunter and Mariner for Integrated Battle Problem 23.2, calling at western Pacific ports and reaching Sydney Harbour. Before that deployment Ranger and Mariner had logged nearly 100,000 miles in supervised autonomy. Leidos holds a Naval Sea Systems Command task order to manage, operate and maintain the Navy's Overlord and medium USVs, worth up to approximately 95 million US dollars with all options.
功能特色
- Medium unmanned surface vessel (MUSV), Ghost Fleet Overlord OUSV 1
- Converted commercial fast supply vessel
- hull built by Gulf Craft, Franklin, Louisiana
- Autonomous conversion by Gibbs & Cox, a Leidos subsidiary
- Length overall 193 feet (59 m)
- Beam 32 feet (10 m)
- Deck capacity 6 containers as modular payload
- Five 2,000 hp (1,491 kW) diesel main engines
- Waterjet propulsion, three generators
- Semi-autonomous: operators in-the-loop or on-the-loop
- Runs LAVA, the Leidos Autonomous Vessel Architecture
- Test-fired an SM-6 Standard Missile from a modular deck launcher in 2021
- Transferred to the US Navy in early 2022
- Crossed the Pacific for Integrated Battle Problem 23.2 in 2023, reaching Sydney Harbour
- Ranger and Mariner logged nearly 100,000 miles in supervised autonomy before deployment
技術規格
已驗證| 物理參數 | |
| 外形尺寸 | L 59 m × W 10 m |
|---|---|
| 移動能力 | |
| 移動類型 | 水生 |
| 作業環境 | Open ocean and littoral waters |
| 感知與計算 | |
| 軟體 / AI | LAVA (Leidos Autonomous Vessel Architecture); semi-autonomous, operators in- or on-the-loop |
技術規格
已驗證| 物理參數 | |
| 外形尺寸 | L 59 m × W 10 m |
|---|---|
| 移動能力 | |
| 移動類型 | 水生 |
| 作業環境 | Open ocean and littoral waters |
| 感知與計算 | |
| 軟體 / AI | LAVA (Leidos Autonomous Vessel Architecture); semi-autonomous, operators in- or on-the-loop |
圖片

圖片貢獻
影片
機器人論壇
正在載入論壇...
評分
常見問題
What is the Leidos Ranger?
Ranger is a medium unmanned surface vessel operated by the US Navy and delivered by Leidos - the first of the Ghost Fleet Overlord vessels, designated OUSV 1. It is not a clean-sheet design.
Who makes the Leidos Ranger?
The Leidos Ranger is made by Leidos, a robotics company based in United States.
How much does the Leidos Ranger cost?
Leidos has not publicly announced pricing for the Leidos Ranger. You can enquire through RobotAIGeek for current pricing.
What is the Leidos Ranger used for?
The Leidos Ranger is designed for 偵察, 監測, and 巡邏. It is used in 國防 and 政府 settings.
When was the Leidos Ranger released?
The Leidos Ranger was released in 2022.
與同類機器人對比
看看這款機器人與最接近的同類產品相比表現如何
- Leidos Ranger vs Leidos Sea Hunter
- Leidos Ranger vs Leidos Sea Dagger
- Leidos Ranger vs Leidos Sea Archer
- Leidos Ranger vs Leidos Sea Specter
- Leidos Ranger vs Leidos Mariner

